Search found 9 matches
- Wed Sep 18, 2024 9:17 am
- Forum: Hydraulic Design
- Topic: travel time
- Replies: 0
- Views: 6
travel time
I'm a bit confused about the travel time, specifically the MAXIMUM LATERAL TRAVEL TIME. I would like to better understand how this time is calculated, as it seems to be greatly overestimated. For example, a lateral drip line that is only 50 meters long, at level, results in times exceeding 20 minute...
- Wed Sep 18, 2024 3:57 am
- Forum: Hydraulic Design
- Topic: nominal specific discharge rate (lph/100)
- Replies: 0
- Views: 15
nominal specific discharge rate (lph/100)
Dripper SDR Hello, I am registering a new dripper pipe, its nominal flow rate is 1.6 liters per hour, when I fill in the nominal specific discharge rate (lph/100) should I fill it with the nominal flow rate of the dripper which is 1.6, or should I use the real flow rate which would be 2.2 liters per...
- Thu Sep 12, 2024 1:03 am
- Forum: Hydraulic Design
- Topic: Filling a Reservoir
- Replies: 3
- Views: 71
Re: Filling a Reservoir
Thank you for your help, I am sending you the file of a situation similar to the one I reported. Could you please check it?
- Wed Sep 11, 2024 2:24 am
- Forum: Hydraulic Design
- Topic: Filling a Reservoir
- Replies: 3
- Views: 71
Filling a Reservoir
Good morning, I performed a calculation to size a supply in the following situation. Let's say the water source is at a height of 30, the pipe runs 100 meters up to elevation 60, which is halfway along the stretch, after which it drops to elevation 20. When I get the system duty report, the required...
- Fri Feb 16, 2024 6:28 am
- Forum: Reports
- Topic: Relatorio de materiais da zona
- Replies: 2
- Views: 1500
Re: Relatorio de materiais da zona
OK MUITO OBRIGADO
- Wed Feb 07, 2024 1:42 am
- Forum: Reports
- Topic: Relatorio de materiais da zona
- Replies: 2
- Views: 1500
Relatorio de materiais da zona
Bom dia, como emitir a soma de materiais necessários em zona em parte do projeto ( exemplo da válvula 1 ate a válvula 5)
- Wed Feb 07, 2024 1:42 am
- Forum: Reports
- Topic: Relatorio de materiais da zona
- Replies: 0
- Views: 1334
Relatorio de materiais da zona
Bom dia, como emitir a soma de materiais necessários em zona em parte do projeto ( exemplo da válvula 1 ate a válvula 5)
- Sat Dec 23, 2023 12:28 am
- Forum: Hydraulic Design
- Topic: Side line for sprinkler
- Replies: 1
- Views: 1099
Side line for sprinkler
Good morning, it is possible to use more than one diameter on the same weldable PVC side line. As an example, on a side with eight sprinklers of 680 liters/hour, make a gradual reduction to start with a larger diameter pipe and finish with a smaller diameter.
- Wed Dec 20, 2023 9:06 am
- Forum: Databases and Materials Selection
- Topic: Invalid input
- Replies: 1
- Views: 1285
Invalid input
Does the message "Invalid input Minimun is greater than maximum" have to do with the database? How to resolve it when it occurs?