Relatorio de materiais da zona

Post by ONEYHB »

Bom dia, como emitir a soma de materiais necessários em zona em parte do projeto ( exemplo da válvula 1 ate a válvula 5)
User avatar
jovivier
Site Admin
Posts: 897
Joined: Thu Mar 12, 2009 2:57 pm
Company: Lincoln Agritech Ltd, IRRICAD Software
City / Town: Lincoln
Location: Canterbury, New Zealand
Contact:

Re: Relatorio de materiais da zona

Post by jovivier »

Thank you for your question about partial Bill of Material reports.
There are two ways to do this:-

1. A one-off report
You can select the required zones on the screen, using the selection tools, and then action a BOM report. You also have the option to include a name for the report such "BOM for Zones 1-5 Only" so that it is clear what the report includes.

2. A more permanent designation
If the BOM reporting needs to be more permanent then use the "Scope" feature. A "Scope" flag is available in the hydraulic item dialogs. Hydraulic items can be set to:-
· Design + BOM
· Design Only
· BOM Only

This is a very useful tool for staged developments. For example, the pre-existing stage can be set to Design Only – meaning those materials will not appear in the BOM/Costing reports.

Changing the “Scope” for all selected hydraulic items can be achieved in one step:-
1. Select all hydraulic items to be changed e.g., by using a Select option.
2. Select Modify|Change – DO NOT use Change Type.
3. Change the “Scope” to that which is required.
4. Click [OK].

The IRRICAD Team
ONEYHB
Posts: 9
Joined: Wed Dec 20, 2023 3:30 am
Company: KS IRRIGACOES EIRELI
City / Town: PANCAS

Re: Relatorio de materiais da zona

Post by ONEYHB »

OK MUITO OBRIGADO