New Report Travel Time

Post by JP.Oliveira »

Good afternoon.

I already sent this post, but I think I posted it in the wrong place and I didn't get a response, so I decided to try to respond again.

If necessary, I will delete the previous post.

Regarding the travel time report, the areas irrigated with drip tubes have very irregular shapes here in our region in Brazil, and calculating the travel time is a challenge. Since the travel time in our region is mostly related to the length of the drip lines, it is not feasible to use the report models currently available.

We did some tests and I believe I found a solution for our projects, but I don't know how to change the report. Instead of using the longest time of the drip lines (this can be a problem in very short lines with low-flow pipe sections), I thought about using the average travel time of each valve in the report. This time seems to be very close to our reality.

The "Travel Time Summary Report" is very good, but it would be much better to use the average travel time of the drip lines for each valve.

The "Zone Travel Time Report" seems to have all the information needed to obtain the average. I did a test in Excel with the averages and it came out very well. Now I have the challenge of creating the report.

In the past (2012) I did a training course at Netafim on how to edit/improve some reports, but I don't remember or learn enough to do it alone, I need your help.

It would be a great help to make this improvement to the report.

Thank you