Relatorio de materiais da zona

Posted: Wed Feb 07, 2024 1:42 am
by ONEYHB
Bom dia, como emitir a soma de materiais necessários em zona em parte do projeto ( exemplo da válvula 1 ate a válvula 5)

Re: Relatorio de materiais da zona

Posted: Thu Feb 08, 2024 4:14 pm
by jovivier
Thank you for your question about partial Bill of Material reports.
There are two ways to do this:-

1. A one-off report
You can select the required zones on the screen, using the selection tools, and then action a BOM report. You also have the option to include a name for the report such "BOM for Zones 1-5 Only" so that it is clear what the report includes.

2. A more permanent designation
If the BOM reporting needs to be more permanent then use the "Scope" feature. A "Scope" flag is available in the hydraulic item dialogs. Hydraulic items can be set to:-
· Design + BOM
· Design Only
· BOM Only

This is a very useful tool for staged developments. For example, the pre-existing stage can be set to Design Only – meaning those materials will not appear in the BOM/Costing reports.

Changing the “Scope” for all selected hydraulic items can be achieved in one step:-
1. Select all hydraulic items to be changed e.g., by using a Select option.
2. Select Modify|Change – DO NOT use Change Type.
3. Change the “Scope” to that which is required.
4. Click [OK].

The IRRICAD Team

Re: Relatorio de materiais da zona

Posted: Fri Feb 16, 2024 6:28 am
by ONEYHB
OK MUITO OBRIGADO