Page 1 of 1

BOM - phases

Posted: Fri Sep 04, 2009 6:07 pm
by roryvan
May I suggest that the BOM report be split into selected zones to simplify the costing by phases. So if you want the BOM for zones 1-12 only and then seperately for zones 13 - 24 you can stipulate this and have the BOM calculated for these zones without having to do it manually. There is an ever increasing demand for this due to the current economic climate and I would assume that as IrriCad can already do this for zone design summaries that it could be implemented fairly easily? This is quite an important point for us.

Re: BOM - phases

Posted: Mon Sep 14, 2009 11:15 am
by jovivier
Hi Roryvan,

Thank you for your suggestion. We will consider it (it is not as simple as design reports).
At the moment the "Scope" option can be used to do the same thing (change the Scope to "Design Only" so the selected items do not appear in the BOM report). The 9.56 Patch due for release shortly will make this easier as all selected hydraulic items can be changed in one go.

Kind regards,

Jo Vivier