I have a question. Let's say that i created a Tape Irrigation Block-chose the tape, subdivided it into zones, added a mainline, and a water supply. All of it was Computer Selected. I made sure it was all connected, Assigned a System Flow, ran the Zone LP Design, did the Valve Analysis, and then ran the Mainline-LP Design.If i ran a Pressure Map and realized that I needed to make some changes, how big does the change have to be in order to have to Clear Management? Each time I make a change,do I have to run all that I mentioned above again? Any help would be much appreciated. Have a blessed day

Thanks,
Samantha